View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0000030 | bareos-core | director | public | 2012-12-23 11:39 | 2013-03-04 10:40 |
| Reporter | mvwieringen | Assigned To | |||
| Priority | normal | Severity | major | Reproducibility | always |
| Status | closed | Resolution | fixed | ||
| Platform | OpenIndiana | OS | OpenIndiana | OS Version | b151a |
| Product Version | 12.4.1 | ||||
| Fixed in Version | 12.4.1 | ||||
| Summary | 0000030: Director crashes when it starts a copy Job from the scheduler | ||||
| Description | Director crashes when it starts a copy Job from the scheduler | ||||
| Additional Information | It seems the problem is related to the fact that its issued from the scheduler because when you run the Job by hand e.g. run from bconsole it work correctly. | ||||
| Tags | No tags attached. | ||||
|
Diagnosed problem due to jcr->res.next_pool pointer not being initialized at the time its dereferenced in start_migration_job. Added some extra logic to check if we even need to specify a pool or nextpool override by checking if a other pool or nextpool is set compared to the default value that normally would be selected. |
|
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2012-12-23 11:39 | mvwieringen | New Issue | |
| 2012-12-23 11:39 | mvwieringen | Status | new => assigned |
| 2012-12-23 11:39 | mvwieringen | Assigned To | => mvwieringen |
| 2012-12-24 10:34 | mvwieringen | Note Added: 0000033 | |
| 2012-12-24 10:35 | mvwieringen | Assigned To | mvwieringen => |
| 2012-12-24 10:35 | mvwieringen | Status | assigned => closed |
| 2012-12-24 10:35 | mvwieringen | Resolution | open => fixed |
| 2013-03-04 10:40 | mvwieringen | Product Version | => 12.4.1 |
| 2013-03-04 10:40 | mvwieringen | Fixed in Version | => 12.4.1 |